New Bike and Pedestrian Upgrades Coming to Commercial and Liberty Streets SE in Salem

Posted on February 26, 2024
  • Installation of the bicycle crossing signal and flashing beacon crossing starts on March 4th, 2024.
  • Restriping Commercial Street SE with high-visibility bike lanes is coming in the summer of 2024.
  • Lane closures and temporary traffic revisions may be necessary.

Salem, Ore. — Beginning in March 2024, Salem will improve bike and pedestrian infrastructure along Commercial Street SE from Oxford Street SE to Madrona Avenue SE. The project includes installing new high-visibility bike lanes, a bicycle signal to cross Liberty Road S, and a rapid flashing beacon on Commercial Street SE at Triangle Drive SE to provide added awareness and safety for bicyclists and pedestrians.

Key Upgrades:

  • Bicycle Crossing Signal: A bike signal on Liberty Road S at Commercial St SE to create added visibility for cyclists continuing south on Commercial.
  • Rectangular Rapid Flashing Beacon: A flashing beacon sign will be installed at Triangle Drive SE to provide extra visibility for both cyclists and pedestrians at the intersection.
  • High-visibility Bike Lanes: Restriping of bike lanes to include high-visibility green markings will provide dedicated space for cyclists, reducing potential conflicts between cyclists and motor vehicles.

Schedule:

  • Phase 1 (Starting March 4, 2024) This phase will include the installation of a bicycle signal on Liberty Road S and a flashing beacon on Commercial Street SE at Triangle Drive SE. Pedestrians, bicyclists, and drivers should use caution and expect some lane closures and delays.During Phase 1, pedestrian access may be restricted within the work areas and temporary pedestrian routes will be identified around the work zone.
  • Phase 2 (Starting in summer 2024) This phase will include restriping lane lines of Commercial Street SE to install dedicated bike lanes with high-visibility green markings.During Phase 2, work is expected to occur in the overnight hours (9 p.m. to 6 a.m.) Temporary traffic control will include lane closures, limited sidewalk access, and delays along Commercial Street SE from Oxford Street SE to Madrona Avenue SE.

This project was originally identified in the Bike & Walk Salem update to the Salem Transportation Plan 2013. This plan identifies enhanced bike facilities along Commercial Street. In 2018, Salem was awarded funds from the Oregon Department of Transportation’s (ODOT) All Roads Transportation Safety (ARTS) Program to design and install buffered bike lanes on Commercial Street and improve bicycle and pedestrian crossings in the area.

For the latest updates on road construction projects with the City of Salem, visit current road construction projects on our website.

Half Price Oregon
Reigning Ducks
McDonald's
Larrys Locksmith
Jackman Wealth Management
Oregon Medical Centers
Day Heating and Cooling
Home Comfort
Day Energy